Contractor & Planning

Home Renovation Permit Guide

Learn when permits are required for kitchen, bath, structural, electrical, and plumbing work — and who should pull them.

When permits are usually required

Cosmetic work — paint, flooring over existing, cabinet swap without plumbing moves — often does not need permits. Rules vary by municipality.

  • Structural wall removal
  • New plumbing drains or gas lines
  • Electrical panel upgrades
  • Additions and egress changes

Risks of skipping permits

Unpermitted work can block resale, insurance claims, and financing.

  • Failed home inspections at sale
  • Insurance denial after damage
  • Fines and forced removal

What usually needs a permit (and what gets you in trouble)

New electrical circuits, moving plumbing, structural openings, and finishing a basement commonly need permits. Paint and like-for-like faucet swaps often do not. The gray zone is “we just moved the vanity a foot.” If a future buyer’s inspector sees new wiring without a sticker, you own the conversation.

  • Call the building department with a one-sentence scope before you hire
  • HOA approval is not a substitute for a city permit
  • Unpermitted bathrooms can stall a sale or an insurance claim after a leak

Inspections are appointments, not surprises

Rough plumbing and electrical happen when walls are open. Covering up to “save a week” is how you tear finished drywall. Ask the GC whose job it is to call, be home, and meet the inspector. Write that in the contract.

  • Failed inspections need a re-inspect fee and a schedule slip — plan for one
  • Homeowner-pulled permits can make you the contractor of record — know what that means
  • Keep the inspection card; buyers and appraisers ask

Frequently asked questions

Who pays for permits?
Typically the homeowner or GC includes permit fees in the contract. Fee amounts vary widely — $200 to several thousand for large projects.