How kitchen budgets are allocated
Understanding line-item percentages helps you compare contractor bids and spot allowances that are too low or missing scope.
- Cabinets and hardware: 25–40%
- Labor and installation: 35–50%
- Countertops and backsplash: 10–15%
- Appliances and ventilation: 10–15%
Cabinets and hardware
Stock cabinets cost less but offer fewer sizes; semi-custom and custom increase price and lead time but improve fit and storage.
- Include removal and disposal in bids
- Soft-close upgrades add $500–$2,000
- Pantry and island cabinets add significant cost
Countertops, backsplash, and surfaces
Material choice drives this category more than square footage alone — edge profiles and waterfall ends add labor.
- Quartz: $50–$120/sq ft installed
- Granite: $40–$100/sq ft installed
- Tile backsplash: $10–$40/sq ft
Labor, permits, and contingency
Licensed general contractors coordinate trades. Permits are required for structural, electrical, and plumbing changes in most jurisdictions.
- Hold 10–20% contingency
- Get itemized bids with matching scope
- Verify insurance and license before signing