Whole-house in one contract
One crew, one flashing standard, one glass package, one color. Volume pricing per opening is usually better. Disruption is concentrated. This is the cleanest path when 15–20-year-old vinyl is failing across the house.
- Ask for a per-opening schedule so you can drop a closet window if needed
- Confirm lead times so the house is not missing openings for weeks
- Plan interior stool and casing repairs in the same week
Phase by elevation or by failure
Street face first for curb appeal. Bedrooms next for comfort. Baths and kitchens when you remodel those rooms. Keep the same manufacturer series so later windows match sightlines and grids.
- Never mix random big-box leftovers on the same wall if you can avoid it
- Each extra trip has a mobilization cost — fewer phases is cheaper labor
- Failed IGUs should not wait for a “someday” whole-house project
How many is “enough” for a bid
Contractors bid more accurately at 8–10+ openings. One or two emergency replacements are priced as service work. If you only need two now, still share the future plan so the first units are a series you can continue.
- Count unique sizes — custom shapes drive cost more than count
- Include basement egress and garage service door glass in the plan
- Doors (entry, sliders) are a separate scope even if the same company installs them